The initial corrosion time may be decided by structural protection degree and penetration rate of corrosive agents.
而初始时间(或去钝时间)的确定则取决了结构防护程度及有害介质离于的渗透速率。
While drilling in the same formation with the same drilling parameters, the penetration rate of bits of the same degree of wear depends mainly on their cutting structures.
在地层、钻井参数和钻头新度相同的情况下,钻头机械钻速的快慢主要取决于钻头齿面结构是否合理。
应用推荐